Feeds:
Posts
Comments

Posts Tagged ‘Ottawa wind farm’

Pierre Poilievre, M.P.

Nepean-Carleton

News Release

July 12, 2012

FOR IMMEDIATE RELEASE

 

Poilievre, MacLeod call for a moratorium on North Gower industrial wind turbines

Calling for Premier McGuinty to put project on hold until Health Canada Study completed

 

North Gower, ON – In a residential area that sits next to an open farmer’s field, Pierre Poilievre, MP for Nepean-Carleton, Lisa MacLeod, MPP for Nepean-Carleton, and Jane Wilson, President of Wind Concerns Ontario joined together to call for a moratorium on the wind farm project proposed for the village of North Gower. This call follows an announcement from the Federal Minister of Health, Leona Aglukkaq, that Health Canada, in collaboration with Statistics Canada, will be conducting a research study to determine the relationship between noise pollution from industrial wind turbines (IWTs) and the possible health implications for those living nearby.

 

“This research study will provide us with the information we need to keep our fellow citizens safe from harm,” said Poilievre. “Due to increasing reports of health problems, a lack of consensus on this issue, and the need for properly designed clinical research, I am calling for a moratorium on the Marlborough Wind Farm project in North Gower until conclusive evidence from Health Canada can definitively show that there are no adverse health risks associated with living in close proximity to industrial wind turbines.” Poilievre added that he has written an open letter to Premier McGuinty outlining his concerns and hopes that the Premier will act upon his request.

“By forcing industrial wind turbine developments on rural communities, the McGuinty Liberals have stripped away local decision making, driven up hydro costs, lowered private property values, and ignored possible health and environmental impacts,” added MacLeod. “I’m continuing my calls for a moratorium to be placed on further wind developments and I am pleased the federal government has announced a study to determine health effects”

 

Jane Wilson, resident of North Gower and President of Wind Concerns Ontario, said, “It is unacceptable for the Ontario government to continue to approve projects when government staff refuse to acknowledge the problem, are not able to measure the noise, and cannot ensure compliance with their own regulations, which are clearly inadequate.”

 

The Marlborough Wind Farm, initiated in 2008 by Prowind Canada, proposes 10 IWTs in close proximity to the village of North Gower. With a population of over 2,000 people, the majority of the village is within three kilometers from one or more IWT. What is even more concerning is that, according to a map outlining the proposed industrial wind turbine locations, there are more than 30 families living within 800 meters. There is currently no start date for construction of these IWTs; Prowind is currently waiting for approval from the Ontario government before proceeding with the project.

The Health Canada study is slated to be complete in 2014.

[photo attached]

“Poilievre, MacLeod, Wilson & residents of North Gower unite to call for a moratorium on the Marlborough Wind Farm project proposed for the village.”

For further information, please contact:

Austin Jean
Office Manager

Pierre Poilievre, M.P. Nepean-Carleton
T: 613.990.4301 | F: 613.990.4333 | E: poilip1@parl.gc.ca

North Gower-Richmond residents join Lisa MacLeod and Pierre Poilievre for announcement

Advertisements

Read Full Post »

Whenever you try to discuss industrial wind turbines with people who are either uninformed or who have been influenced beyond all reason by the provincial government and by the huge corporate wind developer lobby, one of the things they’ll say is, Look at Europe and the Scandinavian countries…they’ve had wind power for years, with no problems.

Not so. In fact, Denmark offered companies huge subsidies much the way Ontario is doing now, and once they stopped, the wind development slowed. But, in Denmark, communities had a say in where wind turbine projects were located, which had a more positive effect in terms of whether there were problems such as noise.

But news from Denmark this week shows a worsening of the situation there too. Concerns about noise and health effects has resulted in the state-owned company deciding NOT to build any more projects onshore. Very telling. Here is an excerpt from the article.

Mass protests mean the energy firm will look offshore

State-owned energy firm Dong Energy has given up building more wind farms on Danish land, following protests from residents complaining about the noise the turbines make.

It had been Dong and the government’s plan that 500 large turbines be built on land over the coming 10 years, as part of a large-scale national energy plan. This plan has hit a serious stumbling block, though, due to many protests, and the firm has now given up building any more wind farms on land.

Anders Eldrup, the CEO of Dong Energy, told TV2 News: ‘It is very difficult to get the public’s acceptance if the turbines are built close to residential buildings, and therefore we are now looking at maritime options.’

http://www.cphpost.dk/news/scitech/92-technology/49869-dong-gives-up-on-land-based-turbines.html

You can reach the North Gower Wind Action Group at northgowerwindactiongroup@yahoo.ca

Read Full Post »